Construction cleaning

Construction cleaning
Hamburg, Norderstedt and surroundings

Our service in the field of building cleaning in Hamburg, Norderstedt and surroundings

  • building cleaning
  • construction work
  • Baufeinreinigung
  • after construction
  • Baucontainerreinigung
  • Parquet cleaning, laminate, tiles, tiles
  • Cleaning PVC, Vinly and all kind of plastic covering
  • Care of newly laid floor coverings
  • Cleaning hard-to-reach and complicated buildings
  • Cleaning all glass and window types under construction

Your specialist for building cleaning Hamburg, Norderstedt

The construction site cleaning Hamburg, Norderstedt for the new building or for the modernization of existing real estate also belongs to the range of services of our building cleaning. The size of the construction site does not matter to us. Whether 100m² or 10.000m² - we clean where we are needed! At any time we are at your side for all construction phases of your project with real construction site professionals. Our goal is always a timely and carefree acceptance by the client and the construction management. In each phase of construction, a corresponding building cleaning is required. They begin with the rough cleaning in the bodyshop and continue on sporadic intermediate cleaning up to Baufein- as well as Bauendreinigung. As the word Bauendreinigung expresses, it is the last, the final Baureinigung. After that, the client can safely purchase the newly built or renovated property.

Construction cleaning Hamburg, Norderstedt: Phase 1 - rough cleaning

Here in Hamburg, Norderstedt, we subdivide such a construction site cleaning in the course of several weeks and months in the sections construction cleaning, interim cleaning, construction and final cleaning. The last two cleaning processes, depending on the building in Hamburg, Norderstedt, often blended into each other.

During the shell construction phase often more than a rough cleaning is required. The cleaning of the construction site also means the professional disposal of remnants of the raw building materials. Rough cleaning is less a cleaning than rather clearing of rubble and its removal. This is not so easy because a variety of specifications and regulations must be considered both on the site itself, as well as the disposal process. Several craft enterprises are at work both one after the other and at the same time. The shell must be entered safely, as well as the access roads and the entire construction site in Munich. What is needed is professional know-how and sufficient work experience. Without this rough cleaning can not be further worked in this construction phase. The individual trades depend on each other in the chronological sequence. So can be started with the interior only when all remains of the shell construction are eliminated.
Construction cleaning Hamburg, Norderstedt: Phase 2 - Baufeinreinigung
The construction cleaning is one of several construction accompanying, the construction interim cleaning. In this phase, both in fixed intervals as well as needs based cleaning of the entire construction site. Also now the disposal & tidying up belongs to it. The need for cleaning exists both inside the building and on the weather-related often difficult to walk outside surfaces of the building plot. It is also part of the job of building cleaning to keep the construction site safely accessible. With the construction site cleaning Hamburg, Norderstedt we make sure that no one stumbles over building remains that have been left behind or are no longer usable. Experience has shown that this construction phase takes just as long as the previous shell construction. The cleaning requirement for the construction cleaning is accordingly high. When installing and installing a variety of materials are used. Windows and doors are delivered and used, as well as heating elements and inflow and outflow pipes. As a rule, an individual cleaning concept is created for the larger construction object and then processed step by step.
Construction cleaning Hamburg, Norderstedt: Phase 3 - final cleaning
Simultaneously with the beginning of the interior work, every construction cleaning step changes into the last two phases with the construction and subsequent final cleaning. From now on it is really cleaned up to maintained. Transport, handle and mounting marks on windows, doors, tiled walls and on the skirting boards are removed. Then the floor, walls and ceilings are cleaned dust-free, washed off wet or damp or wiped off. And at the latest after the laying of all floor coverings with tiles, carpet, laminate or parquet, as well as after installation in all utility rooms, the Baureinigung Hamburg, Norderstedt is an accurate, you could say meticulous cleaning and care of the interiors. The entry of the resident is now really nothing in the way.